Apr. 27, 2006: Groundbreaking for New Addition
|
|
|
|
Apr. 27, 2006: Groundbreaking
|
|
|
|
Apr. 27, 2006: 11:00AM- Ceremony is Beginning
|
|
|
|
Apr. 27, 2006: First Shovel of Dirt
|
|
|
|
Apr. 27, 2006: About 80 People Attended the Ceremony
|
|
|
|
|
Apr. 27, 2006: The Methodist Ladies Served Lunch After the Ceremony
|
|
|
|
May 6, 2006: Preparing area for sod which had been removed from west & south side of the church
|
|
|
|
May 6, 2006: Chuck Ditmor, Harlan Teichroew, Will Darigler, Bob Cappel, Lance Palacek, Dave Holzworth, & Loy Gravholt laying the sod
|
|
|
|
May 15, 2006: Breaking the black top from parking lot- Bob Law Construction
|
|
|
|
May 16, 2006: Grading and leveling dirt before concrete can be poured for the parking lot
|
|
|
|
|
May 16, 2006: Forms are being put in before pouring curbs- Doyle Stevens Construction
|
|
|
|
May 16, 2006: concrete is being poured for curbs around parking lot
|
|
|
|
May 23, 2006: concrete is being poured in the South East corner of the parking lot; rest of lot is ready for concrete
|
|
|
|
May 30, 2006: Last load of concrete about to be poured on 4th section of parking lot
|
|
|
|
June 13, 2006: the 500 gallon propane tank removed from area just west of the steps from the parking lot
|
|
|
|
|
June 13, 2006: the steps from parking lot are being removed
|
|
|
|
June 13, 2006: retaining wall is being knocked down
|
|
|
|
June 13, 2006: main sidewalk being taken out
|
|
|
|
June 13, 2006: the removal of dirt has begun
|
|
|
|
June 13, 2006: retaining wall and steps are history-bushes and shrubs are gone- This whole process took 3/4 of a day, what took days to construct
|
|
|
|
|
June 13, 2006: loading dirt into truck to be taken across the street and dumped for the new garage
|
|
|
|
June 13, 2006: dirt is being leveled on new garage site- Bob Law Construction
|
|
|
|
June 15, 2006: breaking the black top just south of the church (next to where the steps were)
|
|
|
|
June 15, 2006: the hill, steps, retaining wall all gone- "sink hole" after a heavy rain
|
|
|
|
June 23, 2006: leveling the dirt before footings can be poured for new addition
|
|
|
|
|
June 23, 2006: final process of leveling the dirt before footings are poured
|
|
|
|
June 26, 2006: looking north- This is where the West wall of the addition will be. Trench is being dug for the concrete before footings are poured.
|
|
|
|
June 26, 2006: Looking East- This is the trench for the South wall of the addition where footings will be.
|
|
|
|
June 28, 2006: the tall long pipe is used to put cement into the trenches for footings
|
|
|
|
June 28, 2006: different view of pouring footings- The actual concrete can be seen in the trenches- looking South
|
|
|
|
|
July 6, 2006: the first day of laying block
|
|
|
|
July 7, 2006: second day of laying block
|
|
|
|
July 7, 2006: leveling of dirt which has been hauled from South of church. This is in preparation for new garage.
|
|
|
|
July 12, 2006: looking North East- ground is leveled for new garage
|
|
|
|
July 12, 2006: Ground work is complete for new garage. Looking North- the property line has been reclaimed
|
|
|
|
|
July 12, 2006: The tall metal supports are for the scaffolding that will be used to lay block for the walls.
|
|
|
|
July 12, 2006: The West wall is going up. Notice where the windows are located.
|
|
|
|
July 17, 2006: Looking North East. Walls continue to go up. Same wall as above picture.
|
|
|
|
July 18, 2006: Again looking North East- Block laying has been completed for West and South walls. Part of the brick is up.
|
|
|
|
July 18, 2006: Taken from inside the walls- looking South West
|
|
|
|
|
July 24, 2006: Brick has all been put up. Notice the windows and front entrance
|
|
|
|
July 26, 2006: Erecting pillars and supports for the canopy
|
|
|
|
Aug.1, 2006: Putting up first support beam for canopy
|
|
|
|
Aug. 2, 2006: both support beams are up for canopy
|
|
|
|
Aug. 2, 2006: finished putting up other supports for canopy- looking North
|
|
|
|
|
Aug. 3, 2006: Putting the roof over the canopy
|
|
|
|
Aug. 3, 2006: tractor is inside where lobby will be- putting up ceiling supports
|
|
|
|
Aug. 3, 2006: Inside lobby looking South West- more ceiling supports being put up
|
|
|
|
Aug. 6, 2006: canopy is up- not finished with facing
|
|
|
|
Aug. 8, 2006: looking East- removing cement floor where in the area the elevator will go the hole is where lower double doors were
|
|
|
|
|
Aug. 9, 2006: metal roof is up for canopy; the elevator entrance will be just to the left of the opening. The window will be covered up.
|
|
|
|
Aug. 9, 2006: The elevator will go right there
|
|
|
|
Aug. 9, 2006: the elevator will go just to the left of the wheelborrow
|
|
|
|
Aug. 9, 2006: just another look inside where the lower double doors were
|
|
|
|
Aug. 12, 2006: looking East- the floor is gone, the temporary wall is where the steps were
|
|
|
|
|
Aug. 12, 2006: looking straight where the elevator shaft will go; the metal beams will all be eliminated
|
|
|
|
Aug. 12, 2006: the "left" entrance is for the elevator; the elevator entrance is right next to what was the retaining wall
|
|
|
|
Aug. 14, 2006: These huge round pipes were used as heat ducts under the concrete floor in the down stairs entry way. The elevator will go here.
|
|
|
|
Aug. 15, 2006: Notice the round pipes here. All this rubble has come from the elevator shaft.
|
|
|
|
Aug. 16, 2006: Notice the round hole used for heat. The pipe was 12" across. The elevator will go right here.
|
|
|
|
|
Aug. 18, 2006: cutting the wall to make room for the elevator shaft
|
|
|
|
Aug. 24, 2006: Looking straight up the elevator shaft to what was the coat room to the left and nursery on the right
|
|
|
|
Aug. 24, 2006: looking down the elevator shaft from the coat room
|
|
|
|
Aug. 24, 2006: looking down the elevator shaft from the nursery room
|
|
|
|
Aug. 24, 2006: looking East in the elevator shaft. The scaffolding was used to lay block inside the shaft.
|
|
|
|
|
Aug. 24, 2006: The South wall of the elevator shaft
|
|
|
|
Aug. 30, 2006: The scissor lift was used to lift supplies to the roof to complete the elevator shaft which went above the education wing roof....
|
|
|
|
Aug. 30, 2006: This machine delivered brick to go around elevator shaft- notice men are working on the roof
|
|
|
|
Aug. 31, 2006: working on the underside of the canopy
|
|
|
|
Sept. 1, 2006: Preparing the ground for the sidewalk
|
|
|
|
|
Sept. 1, 2006: The sidewalk has just been poured- South West of Education wing
|
|
|
|
Sept. 4, 2006: continuing sidewalk from above picture- looking East
|
|
|
|
Sept. 4, 2006: Main sidewalk has been poured. Looking East; also work is being done on "Eifs" or area around canopy
|
|
|
|
Sept. 5, 2006: sandblasting the columns- working on ceiling of the canopy
|
|
|
|
Sept. 5, 2006: Looking South- preparing the surface for the sidewalk
|
|
|
|
|
Sept. 7, 2006: Notice new material put on outside (Efis) of canopy and underneath
|
|
|
|
Sept. 8, 2006: looking North inside lobby- White pipes are roof drains. Red beams are wall supports and roof supports.
|
|
|
|
Sept. 8, 2006: Looking East- The floor is all dirt- no concrete poured yet.
|
|
|
|
Sept. 8, 2006: The metal roof of addition before being finished
|
|
|
|
Sept. 8, 2006: material which will be used to cover roof of addition
|
|
|
|
|
Sept. 8, 2006: The finishing brick being put on the elevator shaft
|
|
|
|
Sept. 12, 2006: Looking South in Wesley Hall- The door leading into the lobby will be cut here.
|
|
|
|
Sept. 14, 2006: top beam for the new door in Wesley Hall
|
|
|
|
Sept. 14, 2006: bottom part of shower being put in Men's restroom downstairs off Wesley Hall
|
|
|
|
Sept. 14, 2006: digging treches for putting down plumbing pipes- Looking North
|
|
|
|
|
Sept. 15, 2006: laying the plumbing pipes- looking North
|
|
|
|
Sept. 18, 2006: preparing for new sidewalk just West of the church
|
|
|
|
Sept. 18, 2006: Lobby- all torn up- half of plumbing is in
|
|
|
|
Sept. 19, 2006: pouring the sidewalk just West of the church
|
|
|
|
Sept. 19, 2006: Looking South West from the old church main entrance
|
|
|
|
|
Sept. 19, 2006: Starting to cut the door from the lobby into Wesley Hall
|
|
|
|
Sept. 20, 2006: Finally, the opening into Wesley Hall has been made through the 16" wall.
|
|
|
|
Sept. 20, 2006: looking South from Wesley Hall into the Lobby
|
|
|
|
Sept. 20, 2006: The ground is ready for pouring the concrete near the canopy.
|
|
|
|
Sept. 20, 2006: getting ready to pour the flume at the South West corner of the new parking lot
|
|
|
|
|
Sept. 21, 2006: "The Door"- South wall of Wesley Hall
|
|
|
|
Sept. 21, 2006: The new addition floor is ready for concrete. Wire mesh has been put on the dirt floor.
|
|
|
|
Sept. 26, 2006: The concrete truck unloads the concrete on to an elevator which then unloads the cement into the new addition.
|
|
|
|
Sept. 26, 2006: This hose carries the cement to wherever it is needed to pour on the floor.
|
|
|
|
Sept. 26, 2006: Leveling the newly poured concrete- the hose on the floor carries the concrete- Looking North
|
|
|
|
|
Sept. 26, 2006: walking through and working the concrete- looking North- notice the ceiling structure
|
|
|
|
Sept. 26, 2006: floor has been completely poured and leveled- notice roof drains toward the ceiling- looking North East
|
|
|
|
Sept. 26, 2006: new church sign was heavy- needed a lift to help set the sign- the cross was just recently painted
|
|
|
|
Sept. 26, 2006: new sign- North West corner of the property
|
|
|
|
Sept. 27, 2006: forms are ready to pour remainder of concrete near canopy
|
|
|
|
|
Sept. 28, 2006: new church sign- ready to go- soon to be lighted
|
|
|
|
Sept. 28, 2006: sheet metal beginning to be installed- looking North
|
|
|
|
Sept. 28, 2006: sandblasting the interior column by steps- elevator opening behind worker
|
|
|
|
Sept. 28, 2006: preparing to pour concrete under the canopy
|
|
|
|
Sept. 28, 2006: pouring the concrete under the canopy
|
|
|
|
|
Sept. 29, 2006: recently poured area under canopy and toward Cedar Street
|
|
|
|
Oct. 3, 2006: pouring the bottom portion of driveway off Cedar St.
|
|
|
|
Oct. 3, 2006: looking West toward office area- metal studs are up- ready for dry wall
|
|
|
|
Oct. 3, 2006: looking North West- metal studs are being installed- Rev. Dean's office to the left
|
|
|
|
Oct. 3, 2006: looking South West- Secretary's office just ahead to the right- metal studs being put in place
|
|
|
|
|
Oct. 3, 2006: Lance Palacek unloading rock and fill for retaining wall.
|
|
|
|
Oct. 5, 2006: Lance & Kristi Palacek beginning to put up the retaining wall
|
|
|
|
Oct. 5, 2006: Looking West- more metal studs for sheetrock or drywall
|
|
|
|
Oct. 6, 2006: All concrete work completed
|
|
|
|
Oct. 9, 2006: Final leveling of dirt before trees are planted
|
|
|
|
|
Oct. 9, 2006: more leveling of dirt- Part of retaining wall has been built. Lance is standing on retaining wall.
|
|
|
|
Oct. 9, 2006: Putting up styrofoam on side of canopy- known as "Efis"
|
|
|
|
Oct. 9, 2006: continuing styrofoam around Efis or side of canopy
|
|
|
|
Oct. 11, 2006: The elevator arrived in this truck.
|
|
|
|
Oct. 11, 2006: The elevator is in this crate.- Stacked along North wall
|
|
|
|
|
Oct. 11, 2006: more elevator and contents stacked where the steps are now
|
|
|
|
Oct. 11, 2006: Unit that operates the elevator- East of wall that contains the elevator
|
|
|
|
Oct. 19, 2006: installing new South door- South end of Education Wing
|
|
|
|
Oct. 19, 2006: First stage of putting up retaining wall- East of new parking lot
|
|
|
|
Oct. 19, 2006: putting up more block for retaining wall
|
|
|
|
|
Oct. 24, 2006: In Secretary's office- looking South toward front entrance
|
|
|
|
Oct. 25, 2006: putting final coat of material on sides and under the canopy
|
|
|
|
Oct. 25, 2006: pouring footings for new garage
|
|
|
|
Oct. 26, 2006: preparing the forms for garage floor
|
|
|
|
Oct. 30, 2006: pouring garage floor- cold & windy
|
|
|
|
|
Oct. 30, 2006: another view of pouring the garage floor
|
|
|
|
Oct. 30, 2006: showing duct work in Secretary's office- looking North
|
|
|
|
Nov. 8, 2006: pouring the approaches to the garage
|
|
|
|
Nov. 8, 2006: Derek & helper painting wall and around window in "Conference Room"- painting West wall
|
|
|
|
Nov. 8, 2006: looking inside the elevator shaft- floor of elevator- installing more pieces to the elevator
|
|
|
|
|
Nov. 8, 2006: another picture of unit that powers the elevator
|
|
|
|
Nov. 9, 2006: tearing out big front doors and all glass- looking East up from lobby floor
|
|
|
|
Nov. 9, 2006: standing top of steps looking West- Workers are removing big front doors and all glass.
|
|
|
|
Nov. 13, 2006: looking West down the main steps- Heavy plastic has been hung over the opening.
|
|
|
|
Nov. 13, 2006: installing the new steps- looking East from lobby floor
|
|
|
|
|
Nov. 14, 2006: showing new steps and metal studs for dry wall being installed
|
|
|
|
Nov. 14, 2006: Looking North East- The exterior of the church is basically complete.
|
|
|
|
Nov. 15, 2006: tile in restroom- wall tile
|
|
|
|
Nov. 15, 2006: floor tile being laid in restroom
|
|
|
|
Nov. 15, 2006: railway and steps leading upstairs from lobby
|
|
|
|
|
Nov. 29, 2006: elevator shaft- nearly complete
|
|
|
|
Nov. 29, 2006: storage cabinets in conference room
|
|
|
|
Nov. 30, 2006: looking North in Secretary's office- putting up ceiling tile
|
|
|
|
Nov. 30, 2006: looking East in lobby- putting up ceiling tile
|
|
|
|
Dec. 1, 2006: Cement has been poured on the floor of the steps. Carpet will cover that.
|
|
|
|
|
Dec. 1, 2006: what the ceiling tile covers: copper pipes, heat ducts, electrical wiring
|
|
|
|
Dec. 1, 2006: Another view of what is above ceiling tile
|
|
|
|
Dec. 4, 2006: putting in lobby doors- looking South
|
|
|
|
Dec. 6, 2006: Notice interior of the elevator- panels on the sides
|
|
|
|
Dec. 8, 2006: This used to be the upstairs coat room. The elevator opens on this floor.
|
|
|
|
|
Dec. 8, 2006: Wall in the nursery- Elevator shaft is behind these blocks.
|
|
|
|
Dec. 8, 2006: This unit makes the elevator go up and down.
|
|
|
|
Dec. 8, 2006: The doors from lobby into Wesley Hall- looking South from Wesley Hall
|
|
|
|
Dec. 8, 2006: Retaining wall is up.
|
|
|
|
Dec. 8, 2006: Notice retaining wall and three air conditioners.
|
|
|
|
|
Dec. 11, 2006: furnaces for new addition
|
|
|
|
Dec. 11, 2006: prepairing the steps in lobby for the carpet
|
|
|
|
Dec. 14, 2006: Applying glue in lobby before laying carpet
|
|
|
|
Dec. 14, 2006: carpet is laid in lobby
|
|
|
|
Dec. 15, 2006: Carpet is on the steps and preparation is being made to put "oak" on the railings
|
|
|
|
|
Dec. 16, 2006: looking up the stairway
|
|
|
|
Dec. 16, 2006: overview of pews- those on left have been refinished- on right, not yet
|
|
|
|
Dec. 16, 2006: washing the brick- South West corner of new addition
|
|
|
|
Dec. 28, 2006: assembling the new office furniture
|
|
|
|
Jan. 8, 2007: Materials for new garage
|
|
|
|
|
Jan. 11, 2007: demolishing the wall in the former office area
|
|
|